If there is any problem with this site, please contact Matt Clarke by email or by telephone at 812-295-2800. | Bids & Spec Sheets
Project Description: The project consists of:
- 225 L.F. of 38” x 60” elliptical reinforced concrete pipe - 129 L.F. of 34” x 53” elliptical reinforced concrete pipe - 1,000 L.F. of double (2 in parallel) 29” x 45” elliptical reinforced concrete pipe - 102 L.F. of 24” x 38” elliptical reinforced concrete pipe - 1,091 L.F. of 36” reinforced concrete pipe - 146 L.F. of 30” reinforced concrete pipe - 818 L.F. of 24” reinforced concrete pipe - 838 L.F. of 18” reinforced concrete pipe - 1,066 L.F. of 15” reinforced concrete pipe - 387 L.F. of 12” reinforced concrete pipe - Alternate bids on HDPE in lieu of RCP for a portion of the project - Existing drainage ditch channel widening and ditch re -grading - Associated storm water manholes, reinforced concrete headwall structures, inlets, water main relocations, sanitary sewer reinforcements, new sidewalks and curbs - A prebid conference will be held at 1:00 P.M., Local Time, on Wednesday, February 10, 2010, at the Town Hall, 3675 West Main St., Napoleon, Indiana. Representatives of the Owner, Engineer, and Grant Administrator will be present to discuss the project
Project Description: The project consists of:
Proposal A Temporary treatment system, replacement of filter media & repair of existing Iron Removal Plants (500 GPM & 150 GPM) and installation of pigging facilities on raw water main.
Proposals B & C Surface prep and repainting of Iron Removal Plants and building walls and piping.
Town may award separate contracts for Proposal A and one for Proposal B & C, or a single contract for all work.
Project Description: Division II ~ 250,000 Gallon Elevated Water Storage Tank
- Installation of a 250,000 gallon multi -legged steel elevated water storage tank - An alternate bid will be taken for installation of a 500,000 gallon multi -legged steel elevated water storage tank A prebid conference will be held on April 21, 2010 at 9:00 A.M., Local Time at the office of the Patoka Lake Regional Water & Sewer District, 2647 North S.R. 545, Dubois, Indiana. Anyone considering bidding on this project is encouraged to attend.
Project Description: Division I ~ Transmission/Distribution Improvements & Booster Station No. 6
- Installation of approximately 0.2 miles of 3” diameter water main - Installation of approximately 0.1 miles of 4” diameter water main - Installation of approximately 16.1 miles of 6” diameter water main - Installation of approximately 6.4 miles of 10” diameter water main - Installation of approximately 106 service meters - Installation of approximately 4,600 L.F. of service line - Installation of a Master Meter Pit - Installation of a Booster Station - All other necessary appurtenances A prebid conference will be held on April 21, 2010 at 9:00 A.M., Local Time at the office of the Patoka Lake Regional Water & Sewer District, 2647 North S.R. 545, Dubois, Indiana. Anyone considering bidding on this project is encouraged to attend.
Project Description: The project consists of:
• Approximately 3,250 L.F. of asphalt trails
• A restroom facility
• Asphalt entrance drive and parking lot
• Associated signage, drainage tile, culverts, water and sewer service lines
Project Description: The project consists of:
- Installation of approximately 2.2 miles of 6” diameter water main - Installation of approximately 1.8 miles of 8” diameter water main - Installation of approximately 12 service meters and corresponding service line - Installation of two (2) master meter pits - All other necessary appurtenances
Project Description: The project consists of:
- Installation of approximately 7.6 miles of 16” thru 30” diameter ductile iron water main - Connections to Existing Mains - Renovations/Improvements to an Existing Master Meter Pit - All other necessary appurtenances
Project Description: The project consists of:
- 8,370, L.F. of 3” and 6” PVC SDR 21 Watermain - 1,500 L.F. of open cut and bored encased watermain and other related appurtenances. |
|